Hyper-v

Lamb Chops Ride Hypermotard 1100 Engine build EP1



Well Lamb Chops and I are back to building his Hypermotard 1100 2V engine.

Two years in the waiting, in this episode we aim to progress as far as we can with the bottom end of the engine.

You can find LCR channel here: @LambChopRides

During this video I will cover off the following tasks to assemble the bottom end:

– Checking all the parts are here
– Case check
– Bearing removal and install
– Setting Crank preload
– Setting gearbox float
– Setting Shift drum float

I hope you enjoy this first video in the engine rebuild, please like, share and subscribe for further content

#ducati #hypermotard1100 #engine

[ad_2]

source

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button